Hwy 3 Bridge Construction
|
Joe Kriz |
Posted on 11/15/21 - 10:52 PM
|
Site Owner
Photo Album
Posts: 231
Joined: 12/27/05
Location: Upstate California
|
The bridge construction up has taken almost 5 months of hard work.
It was supposed to be done on November 14, but it appears they are running late.
Below is one photo of the construction on October 19.
I was by there the other day but did not have time to take a photo.
The roadway appeared to have been paved (or concreted in some areas) so it is getting close.
Joe Kriz attached the following image:
[120.32Kb]
Joe Kriz |
|
|
|
Joe Kriz |
Posted on 11/21/21 - 11:22 AM
|
Site Owner
Photo Album
Posts: 231
Joined: 12/27/05
Location: Upstate California
|
Looks like we are getting close.
The work trucks were driving on the bridge today and it appears they are cleaning up and all the rails look finished.
Supposed to be finished on Wednesday, November 24 just in time for Thanksgiving.
Joe Kriz attached the following image:
[145.21Kb]
Edited by Joe Kriz on 11/21/21 - 11:29 AM
Joe Kriz |
|
|
|
Joe Kriz |
Posted on 12/01/21 - 12:17 PM
|
Site Owner
Photo Album
Posts: 231
Joined: 12/27/05
Location: Upstate California
|
The bridge was finished around 5PM on Tuesday, the day before Thanksgiving.
5 months of work and blinking warning signs and stop signs.
Whew.
Joe Kriz |
|
|